Step 2 installation

step2 Installation and Onboarding

  • Technical Assessment:

    • Conduct a technical assessment to ensure the location is suitable for installing digital monitors, considering factors like power supply, network connectivity, and visibility.

    • Provide the host with a clear timeline for installation, minimizing any disruption to their business operations.

  • Agreement Signing:

    • Once both parties are satisfied, facilitate the signing of the lease agreement, outlining the terms and conditions agreed upon during the initial consultation.

  • Installation Process:

    • Deploy a professional installation team to set up the digital monitors according to the agreed-upon plan.

    • Ensure the host is informed and involved throughout the installation process to address any concerns or modifications.

  • Testing and Onboarding:

    • Conduct thorough testing to ensure the monitors are functioning correctly and displaying content as intended.

    • Provide the host with onboarding materials and training, if necessary, to understand how to interact with the system and manage the advertising content.